How a job runs
The order matters. Lines go in before the surface is finished, and nothing is dug until locates are done.
Tell us about the site
Send the address, photos and any drawings or surveys you have. A phone call works too.
Site visit and quote
We look at access, soil, trees, slopes and where material can go, then put the scope and price in writing.
Locates and permits
Before any digging, underground lines are located through Ontario One Call. Tree, grading or other permits are confirmed at this stage.
Clear the land
Trees, stumps, brush and debris come out. Topsoil is stripped and piled if it will be used again.
Excavate and trench
We dig foundations, pads and the trenches for water and hydro lines. Lines are inspected before they are covered.
Backfill, level and compact
Trenches are closed in layers. High and low spots are cut, filled and compacted.
Walk-through
We go over the finished site with you. It is left clean and ready for final grading.
What the paint on the ground means
After a locate request you will see coloured paint and flags around the property. Each colour marks a different buried line. Please leave them in place until the work is finished.
- WhiteProposed digging area
- PinkTemporary survey marks
- RedElectric and hydro lines
- YellowGas and oil
- OrangePhone, cable and fibre
- BlueDrinking water
- GreenSewer and drain lines
- PurpleReclaimed water
Ready for step one?
Call us, or send the details and we will follow up.
